欢迎光临兴建机械有限公司水轮机厂(本厂提供:水轮机[混流式.贯流式.轴流式.冲击式.斜击式] 、水电站设备)
New Message Message List Message Management

Name: 段雪辉
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
求购水轮机HAL551-LJ-84含励磁、自动化,发电机SF2000-8/1730含调速器
Message Time:2006-04-23 09:02:52
Answer:

Name: 郝保红
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
全套5000kw设备需多少钱
Message Time:2006-04-19 10:44:56
Answer:

Name: 梁先生
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
杨总:你好!
我单位已经确定要购买贵单位的GD360-25-25kw和GD360-25-15kw水轮机,现在急需这两台水轮机的质量、精确尺寸等详细资料来搞施工图设计工作,烦请杨总尽快提供设计所需的详细资料,谢谢
Message Time:2006-04-19 10:08:22
Answer:

Name: 陆庆梅
Tel: Email:
Theme: 我想安装一台500KW的水轮发电机
Design head(m): 未知Maximum head(m) : Minimum head(m): 未知
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: 是Adress: 名称[还没想好],地址:贵州省丹寨县兴仁镇
Your Message:
要求质量第一,价格合理.再要求300KW的准确价格是多少,500KW的准确价格是多少.请给我尽快回复!谢谢!!!
Message Time:2006-04-17 16:39:55
Answer:

Name: 刘延峰
Tel: Email:
Theme: 水电站改造
Design head(m): 35米Maximum head(m) : 38Minimum head(m): 32
Design flow: 单机引水1.15立方米/秒Minimum flow: 无Meters above sea level(m) : 1740Installed capacity: 320kw 2台
Operation in parallel or not: 是Adress: 延安王瑶水库
Your Message:
机组运行20几年,没有专业人员修理,长期发电量150kw/小时,手动并网,不安全,问一下,换一台机组的价钱
Message Time:2006-04-15 14:14:55
Answer:

ReturnFirst PagePrevious PageNext PageLast Page Page:83/154


Contact:Yang Guangping Telephone: (86-833)5544996 13990613689 Fax: (0833)5544996 Email:yanggp@163.com

Address: No. 28, 43 Hongchun Road, Emeishan, Sichuan Province. Zip Code: 614200