欢迎光临兴建机械有限公司水轮机厂(本厂提供:水轮机[混流式.贯流式.轴流式.冲击式.斜击式] 、水电站设备)
New Message Message List Message Management

Name: 李腾江
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
本人现有两台55KW/H混流式机组。可能因年限问题,效率严重低下,迫切需要更换机组。能否请贵厂相关技术人员前往,提取参数配备最合适的机组。
Message Time:2006-07-07 22:06:12
Answer:

Name: 徐成浩
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
杨先生:你好!
我想建设一个水力发电站,水头高差为230米,水流量为0.8个流量,每天能发多少度电,用什么发电机组最好?价格为多少?请即时回答为谢!
Message Time:2006-07-04 22:24:34
Answer:

Name: 徐成浩
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
请告知落差200米
Message Time:2006-07-04 00:19:26
Answer:

Name: 张福春
Tel: Email:
Theme:
Design head(m): 2mMaximum head(m) : 3mMinimum head(m): 1.5m
Design flow: Minimum flow: Meters above sea level(m) : 3mInstalled capacity: 75kw
Operation in parallel or not: 未定Adress:
Your Message:
想知道75千瓦的机系安装到使用一共需要多少钱???
Message Time:2006-06-30 22:03:01
Answer:

Name: 林曙刚
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我是贵州省某县城一水电站设备采购商,烦请报以下设备价格:
水轮机P502-LH-160(10) 4台
发电机SF1000-24/2600
水轮机HL280-LJ-130 2台
发电机SF3200-18/2840
请报成本价和市场指导价
Message Time:2006-06-30 10:25:46
Answer:

ReturnFirst PagePrevious PageNext PageLast Page Page:78/154


Contact:Yang Guangping Telephone: (86-833)5544996 13990613689 Fax: (0833)5544996 Email:yanggp@163.com

Address: No. 28, 43 Hongchun Road, Emeishan, Sichuan Province. Zip Code: 614200