Name: 王万学 | | Tel: | Email: | Theme: | Design head(m): | Maximum head(m) : | Minimum head(m): | Design flow: | Minimum flow: | Meters above sea level(m) : | Installed capacity: | Operation in parallel or not: | Adress: | Your Message: | 12米净水头,流量8个,选两台机组,我准备选择用贯流式机组,节约点土建投资,请帮助提供选型建议。并提供机组报价,以及选用其它机组报价, | Message Time:2013-12-18 17:11:16
| Answer: | |
Name: 胡赞 | | Tel: | Email: | Theme: | Design head(m): | Maximum head(m) : | Minimum head(m): | Design flow: | Minimum flow: | Meters above sea level(m) : | Installed capacity: | Operation in parallel or not: | Adress: | Your Message: | 我们公司水泥余热发电厂
冷却塔风机计划进行改造
去电力为水动力,望回电 | Message Time:2013-12-11 16:07:56
| Answer: | |
Name: 叶叔 | | Tel: | Email: | Theme: | Design head(m): | Maximum head(m) : | Minimum head(m): | Design flow: | Minimum flow: | Meters above sea level(m) : | Installed capacity: | Operation in parallel or not: | Adress: | Your Message: | 02年购乐清XL一78一32/L7水轮机一台,现想新购一台节能水轮机,问需多少钱 | Message Time:2013-05-28 11:09:26
| Answer: | |
Name: 马永泉 | | Tel: | Email: | Theme: | Design head(m): | Maximum head(m) : | Minimum head(m): | Design flow: | Minimum flow: | Meters above sea level(m) : | Installed capacity: | Operation in parallel or not: | Adress: | Your Message: | 我八六年私人买了集体老水力设备一套,[有手续在]后来没干转行了,但河水长年不断流,我想发展办小型水力发电厂,但一切为零,只有手续在梦想在,请大师专家给以分析,看能否开设, | Message Time:2013-05-14 20:09:55
| Answer: | |
Name: 梁先生 | | Tel: | Email: | Theme: | Design head(m): | Maximum head(m) : | Minimum head(m): | Design flow: | Minimum flow: | Meters above sea level(m) : | Installed capacity: | Operation in parallel or not: | Adress: | Your Message: | 我有需求 收到尽快联系我 | Message Time:2013-04-20 11:50:14
| Answer: | |
|
Contact:Yang Guangping Telephone: (86-833)5544996 13990613689 Fax: (0833)5544996 Email:yanggp@163.com
Address: No. 28, 43 Hongchun Road, Emeishan, Sichuan Province. Zip Code: 614200
|
|