欢迎光临兴建机械有限公司水轮机厂(本厂提供:水轮机[混流式.贯流式.轴流式.冲击式.斜击式] 、水电站设备)
New Message Message List Message Management

Name: 施光伟
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
家用微型水力发电机价格多少?
Message Time:2007-02-06 12:12:06
Answer:

Name: 黄海帆
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
杨先生:
我想投资建一个水电站,但不知怎样才知可以建多大功率的,能帮我想点什么办法吗?
黄海帆
Message Time:2007-02-05 16:22:33
Answer:

Name: 向江
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: 是Adress:
Your Message:
你好
我想问一下20KW需要多少钱?我的水流量100立方/小时,落差7米,谢谢
Message Time:2007-02-03 09:10:46
Answer: 水量太小,20KW的水流量需1550立方/小时,价4万元

Name: 施徳进
Tel: Email:
Theme: 想选购一套发电设备
Design head(m): 25米Maximum head(m) : Minimum head(m): 18米
Design flow: Minimum flow: 20吨/时Meters above sea level(m) : 950米Installed capacity: 8-10千瓦
Operation in parallel or not: 是Adress:
Your Message:
请您们给我提供最佳方案,并报价
Message Time:2007-02-01 00:17:05
Answer: 水量太小

Name: 方新留
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: 是Adress:
Your Message:
我想购买30kw水轮发电机。多少钱/?请以我联系
Message Time:2007-01-30 13:31:05
Answer: 5.5万元

ReturnFirst PagePrevious PageNext PageLast Page Page:58/154


Contact:Yang Guangping Telephone: (86-833)5544996 13990613689 Fax: (0833)5544996 Email:yanggp@163.com

Address: No. 28, 43 Hongchun Road, Emeishan, Sichuan Province. Zip Code: 614200