冷却塔节能改造资料
Message Time:2010-12-03 11:19:59
Answer:

Name: 扬
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
本人现在筹备一水电站,想从贵厂进设备,望给予提供些信息
Message Time:2010-12-02 21:13:02
Answer:

Name: 宋怀翔
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
专家好:请问溪水的流量怎么测量及计算啊?假设某处狭窄的地方水流集中,水面宽200mm,深150mm,沟底大致半圆形,除了此处之外水流很散,我在此处同时丢下一把树叶,在下游10米处飘着的树叶前前后后的,时间不好确定,水的流量就更不好确定了,请指教。十分感谢。
Message Time:2010-11-24 17:52:17
Answer:

Name: 邹先生
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我有一座900千瓦的小型水力发电站(一台500,一台4000),现在想更换二台旧机子。一台有16米的水头,一台有28米的水头。请问,更换上述二台机子(包括内磁柜),须要多少钱?
Message Time:2010-11-16 22:20:33
Answer:

Name: 邢先生
Tel: Email:
Theme: 小型水轮发电机
Design head(m): 24Maximum head(m) : 28Minimum head(m): 15
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity: 3360
Operation in parallel or not: 是Adress: 甘肃省金塔县鸳鸯池电站(金塔县鸳鸯池水库)
Your Message:
准备在下游输水渠道在新增一台小型水轮发电机组,水头约为6米,流量2M3/S,恳请贵公司计算一下,能装多大的机组,全套价格是多少。另外,能否在现有的发电站尾水输水洞出口增装机组,流量在8——16M3,水头只有0.5M左右,请答复!
Message Time:2010-11-09 23:23:17
Answer:

ReturnFirst PagePrevious PageNext PageLast Page Page:16/154


Contact:Yang Guangping Telephone: (86-833)5544996 13990613689 Fax: (0833)5544996 Email:yanggp@163.com

Address: No. 28, 43 Hongchun Road, Emeishan, Sichuan Province. Zip Code: 614200