欢迎光临兴建机械有限公司水轮机厂(本厂提供:水轮机[混流式.贯流式.轴流式.冲击式.斜击式] 、水电站设备)
New Message Message List Message Management

Name: 董铭伟
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
贵司:
你单位的 “工业循环水系统节能改造专用的管道式水轮机 ”需要的循环水回水压力能有多大?目前我公司循环水量约6万吨/天,回水压力约0.1MPAG,能否应用贵公司的设备,请予以回复!
Message Time:2010-12-22 11:42:06
Answer:

Name: 黄红星
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
需购1500水轮发电机一台
Message Time:2010-12-14 21:28:25
Answer:

Name: 黄红星
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
需购1500水轮发电机一台
Message Time:2010-12-14 21:27:29
Answer:

Name: 杨帝章
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
杨总:家门,你好!
请教你,在高层建筑中央空调系统进行水力发电改造可否?参数如下,水流量0.64立方/秒,0.83立方/秒,高度43米;管径D630。水流量0.52立方/秒,高度110米,管径D630。水流经水轮机后尾水管压降低多少?本人是从事空调工程业务的,有兴趣做你产品在广东广西的代理。谢谢!
Message Time:2010-12-08 17:55:08
Answer:

Name: 贾铭
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我公司目前有2台冷却循环水塔,共4台7.5KW电机,4台3KW电机;希望改造成无动力冷却水塔,如何改造?请致电!
Message Time:2010-12-08 15:05:39
Answer:

ReturnFirst PagePrevious PageNext PageLast Page Page:15/154


Contact:Yang Guangping Telephone: (86-833)5544996 13990613689 Fax: (0833)5544996 Email:yanggp@163.com

Address: No. 28, 43 Hongchun Road, Emeishan, Sichuan Province. Zip Code: 614200