New Message Message List Message Management

Name: 李雪奎
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: 是Adress:
Your Message:
了解GD-Wz-20A水轮机的技术资料及设备价格
Message Time:2005-04-10 15:55:31
Answer: 3kw=0.7万元/全套,5kw=1.0万元/全套,7.5kw=1.2万元/全套,

Name: 余仕洪
Tel: Email:
Theme: 发电机组
Design head(m): 50Maximum head(m) : 52Minimum head(m): 40
Design flow: 1.1立方米/秒Minimum flow: 0.2Meters above sea level(m) : 502Installed capacity: 350-500(2台)
Operation in parallel or not: 是Adress: 响水凼电站3级 南川
Your Message:
1.机组选择
2.装机选择
3.报价
Message Time:2005-04-02 09:21:14
Answer:

Name: 李栋梁
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
求购300KW水能发电机组,望尽快与我联系。
Message Time:2005-03-29 17:24:35
Answer:

Name: 洪雅天宫陈嘴电站
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
水轮机ZDJP502-LH-120发电机SF500-20
及配件各两组最低价多少钱?
Message Time:2005-03-24 23:43:12
Answer:

Name: 吴红云
Tel: Email:
Theme:
Design head(m): 11.2Maximum head(m) : Minimum head(m):
Design flow: 2.01Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: 是Adress:
Your Message:
装什么型号的机组较好?交货的时间?
Message Time:2005-03-19 23:08:10
Answer:

ReturnFirst PagePrevious PageNext PageLast Page Page:134/154