欢迎光临兴建机械有限公司水轮机厂(本厂提供:水轮机[混流式.贯流式.轴流式.冲击式.斜击式] 、水电站设备)
New Message Message List Message Management

Name: 郭秋菊
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我咨询贵厂:将兴建一座水头200米,流量0.15M3/秒.集雨面积4平方公里的水电站.要求装一台600KW.一台300KW的发电机组.直接发电上网.能帮忙核算吗.
Message Time:2005-09-25 11:42:03
Answer:

Name: XRL
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
我的提问请用Email回复
Message Time:2005-09-25 10:09:53
Answer:

Name: XRL
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
请问一台100KVA的水轮发电机组需多少钱,流量及落差要求;原水轮机与发电机相分离式的小机组如何改造
Message Time:2005-09-25 10:08:30
Answer:

Name: 曾
Tel: Email:
Theme:
Design head(m): Maximum head(m) : Minimum head(m):
Design flow: Minimum flow: Meters above sea level(m) : Installed capacity:
Operation in parallel or not: Adress:
Your Message:
400千瓦的发电机多少钱?水头高140米。流量0.3立方米。
Message Time:2005-09-24 19:44:16
Answer:

Name: 苏光辉
Tel: Email:
Theme: 20米的水头能用冲击式水轮机吗?为什么?
Design head(m): 20Maximum head(m) : 25Minimum head(m): 20
Design flow: 0.35Minimum flow: 0.30Meters above sea level(m) : 350Installed capacity: 40
Operation in parallel or not: 是Adress: 架桑电站.山西省夏县架桑
Your Message:
希望能及时给与回复
Message Time:2005-09-24 12:40:29
Answer:

ReturnFirst PagePrevious PageNext PageLast Page Page:115/154


Contact:Yang Guangping Telephone: (86-833)5544996 13990613689 Fax: (0833)5544996 Email:yanggp@163.com

Address: No. 28, 43 Hongchun Road, Emeishan, Sichuan Province. Zip Code: 614200